The past two days have been spent installing the wiring harness, assembling the rear engine hood, installing the windshield, reinstalling the rear bumper, applying the wheel well undercoating and blasting the wheels in preperation for paint. We have also installednumerous other interior and dash parts to reduce the pile of parts we have on hand for the car.
The windshield has been installed
The rear engine hood has been assembled and installed along with the license plate bracket and lighting.
We are ready to put the wheels back on as soon as they are painted.